Tuesday, April 19, 2011
Long overdue House update
Monday, April 18, 2011
Pregnancy - sleeping, swimming and yoga
I've been finding sleeping increasingly hard. I'm now at the point where I can't really sleep on my belly without squashing it's contents - sleeping on the side is supposed to be best during pregnancy - even better if it is the left side. Unfortunately I was 'blessed' with wide hips (hopefully a boon during childbirth), and as a consequence it is impossible for me to lie on my side without sagging in the waist, causing my back to curve and ache like hell. I've tried putting a pillow under my waist and one between my legs, which help a bit but all in all I wake up with a pretty sore back.
I had determined to do an hour of yoga every day as well as my 1.2 mile snorkel swim. The swimming has been a pleasure - I love the ocean and it also lets me escape from this heat and see friends on the beach. I rarely miss a day.
Yoga has been more of a chore, until this morning! My back felt in such a desperate need of as good stretch out that yoga was great. My yoga teacher is sadly on vacation this month, which means that I am left to motivate myself to do a morning yoga session each day. I am going to persist with this though as it does bring such relief to my back. Looking forward to Selene's return as it is so much nicer doing yoga with a group.
Monday, April 4, 2011
14 Weeks 4 days down (25 weeks 3 days to go)
I have been pretty sick, although this is showing signs of letting up A LITTLE. I've given up work almost completely now. We didn't know I was pregnant for the first month as we had a negative pregnancy test result and a light period. As a result this little peanut has been scuba diving on many occasions, while mommy has been lifting tanks weighing well in excess of the recommended 30lbs, running and roller skating!!!
I have been exercising regularly (especially over the last month). I'm swimming a little over a mile almost every day and doing prenatal yoga 3 days a week (working on increasing that to 6 days any day now) and I also plan to re-work daily meditation back into my schedule. I am very blessed in that I do not have to work. My head has been very 'foggy' and nausea has left me feeling like doing very little, but I have taken up painting. It's been something I've been meaning to return to for ages (maybe 20 years!). Anyway here are two of my first attempts:

Between painting and exercise I've been pretty busy. Our house is coming along well too. The ground floor is structurally complete including plastering (sheet rock if you are American), electric, sewage and water (well almost) and the second floor has all of its walls. We are hoping to get the roof on the second floor before the end of this month, then it will be a race against time to get it all finished by D day (September 29th).When I say I've stopped working - that is not absolutely true. I will be working in New York for my old company for 2 weeks at the beginning of May which will be nice. Great to see friends (both home friends and work), good to fill in some time (I'll be almost 20 weeks when I return to Mexico) and fantastic to get some shopping in. I am desperate for refills of my favorite shampoo and conditioner and I have a long list of baby things to buy. All very exciting!
Friday, December 24, 2010
Christmas
Wednesday, December 8, 2010
Long Awaited House Update...
So my last update predated my trip to Greece and London in October/ November. Before I left, preparations were being made to put the roof on the house (the roof will ultimately be the floor to the second floor of the house). Here in Mexico houses are made of bricks and the roof of flat concrete. Once the walls are in place a platform is constructed in wood to carry the weight of the concrete, which will be poured to make the roof:
After the wood is laid, tubeing is placed over the top of it to house electricity cables and the drainage pipes were also laid for our 2nd floor bathroom.
Our roof was poured the day before I left and I did not manage to be there to take pictures. There are a few ways to make these cement roofs and we arranged for a cement truck to come and pour pre-mixed cement. This only takes a few hours and the pre-mixed cement has additives which make it harden faster and give it more resistance to moisture. After the concrete has been poured it is left to harden over a period of 5-7 days and then the wood is taken away. This is the house as it looked when I arrived back from my trip: